In October 2001 the first produced CMS Barrel Drift Tube (DT) Muon Chamber was tested at the CERN Gamma Irradiation Facility (GIF) using a muon beam. A Resistive Plate Chamber (RPC) was attached to the top of the DT chamber, and, for the first time, both detectors were operated coupled together. The performance of the DT chamber was studied for several operating conditions, and for gamma rates similar to the ones expected at LHC. In this paper we present the data analysis; the results are considered fully satisfactory.
Test beam analysis of the first CMS drift tube muon chamber
AMAPANE, Nicola Carlo;CIRIO, Roberto;MONACO, Vincenzo;PERONI, Cristiana;ROMERO, Alessandra;SACCHI, Roberto;
2004-01-01
Abstract
In October 2001 the first produced CMS Barrel Drift Tube (DT) Muon Chamber was tested at the CERN Gamma Irradiation Facility (GIF) using a muon beam. A Resistive Plate Chamber (RPC) was attached to the top of the DT chamber, and, for the first time, both detectors were operated coupled together. The performance of the DT chamber was studied for several operating conditions, and for gamma rates similar to the ones expected at LHC. In this paper we present the data analysis; the results are considered fully satisfactory.File in questo prodotto:
Non ci sono file associati a questo prodotto.
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.